Client: PCL Construction / Associated Engineering / Goldbar Contractors Industry: Waste Water Treatment Project Timeline : 2024-2026 Scope of work: Supply and install OWSJ, Structural Steel, Exit & Egress Stair, Embed, Brick Angle, Aluminum Clarifier Railings, Aluminum Bioreactor Rails, Aluminum Crossover Stairs & Rails, Aluminum Hatches and Checker plate covers, Blockwall Support, Crane Beams, and Swing gates. |
ProjectTrain 4 Arrow Utilities Wastewater Treatment Plant Upgrade is currently underway in the Strathcona County. The project will add a fourth secondary train train using membrane bioreactor removal technology. Norfab's contributions to the project are being executed in two phases, described below. Phase 1: Mechanical-Electrical Supports, Pipe Supports Columns and Frames , Pipe Support cantilevered assemblies, Pipe Saddles (Stainless/Galvanized). Phase 2: Bioreactor, MBR, and PEPS Structural Steel and Miscellaneous Metals. |
![]() |
![]() |
Completed & In Progress Projects
We are happy to share some of our completed and in progress projects over Norfab's history. Past projects are added weekly, stay tuned!
A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.
The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.