Client: PCL Construction / Stantec / AECOM / City of Edmonton / Stantec Industry: City of Edmonton / Katz Group Project Timeline : 2014 - 2020 Scope of work: Atrium Structural Glazing Wall (Design Build) Stainless Elevator Cladding, Corridor Base Rake Trims, Entrance Gilles, Canopy Glazed Supports, Exterior Stainless Railings, Overhead Door Supports, Parkade Entrance Guides and Card Posts Readers, Tower Shaft Exit Railing, Penthouse Stairs and Structural Framing |
ProjectTower D – Norfab worked on the free standing HSS entrance curtain wall for two months. The AESS specification and glazing wall tolerances required us to install a perfectly set HSS seamless substrate in order to allow for other trades to complete their work. Atrium custom polished Aluminum grilles , entrance stainless headers/jambs. The most challenging scope was the Elevator lobby stainless steel polish 8mm/6mm and 10ga trims. Norfab’s installation crew spent months setting substrates, which were custom built to accept the glass & wood accent panels, as well as base covers. Tower E – Stantec Tower was to become the tallest tower in Albert and the Norfab team was ecstatic to find out we were to be a part of it. This tower would hold precedence for many many years to follow and can be seen from Miles away entering from the North/South/East or West. |
![]() |
![]() |
Trade Coordination Related Items / Miscellaneous Metals
|
Completed & In Progress Projects
We are happy to share some of our completed and in progress projects over Norfab's history. Past projects are added weekly, stay tuned!
A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.
The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.
Find us in North West Edmonton |