Client: Stuart Olson Construction / Dialog / AECOM / City of Calgary Industry: Alberta/Calgary Infrastructure Project Timeline: 2013 - 2018 Awarded Scopes: Suspended Structural Atrium Stairs, Exits Railings, Podium Grilles, Ornamental Stainless railing, Children Play structure, Balcony Guard post, Mechanical Room secondary support, Borrowed light framing, Illuminated exterior Stainless Rails, Shutter Grills framing, Overhead Door Supports, and Loading Dock Protection. |
ProjectWorking on the New Central Library alongside Stuart Olson and Dialog for this project was a true pleasure. The architectural and structural design of the building is truly a sight to behold. The unique design presented numerous challenges and opportunities for Norfab to innovate. Norfab was responsible for all miscellaneous metal items, exit stairs, and exterior grating. Additionally, the ornamental metals, such as the exterior/interior stainless railings and landscaping metal items (excluding the Drinking Birds), were under our scope as well. |
![]() |
![]() |
HighlightsThe beginning highlight of the project was the Atrium Stairs. Norfab worked closely with Stuart Olson and their survey team, taking countless independent scans to evaluate the geometry. We worked closely with Dialog to resolve construction tolerances needed to make this a successful installation and fabrication. |
|
Trade Coordination Related Items / Miscellaneous Metals
|
Completed & In Progress Projects
We are happy to share some of our completed and in progress projects over Norfab's history. Past projects are added weekly, stay tuned!
A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.
The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.
Find us in North West Edmonton |