Groat Road Bridge Rehabilitation |
|
Client: Graham Construction Edmonton / COWI / City of Edmonton Industry: Alberta/Edmonton Infrastructure Project Timeline: January 2018 – October 2020 Scopes of work: Outrigger Framing Structures, Gantry Truss Structures, Crane Rails, Abutment Steel Rail System, Safety Maintenance Cable system. |
ProjectIn 2018 one of Edmonton’s oldest and most reliable bridges was ready for a face lift. Norfab worked alongside Graham Builders and COWI during the revitalization. |
![]() |
![]() |
HighlightsInstalling the steel required to utilize the bridge piers to maintain their integrity was an exciting process for the team. The outrigger framing was constructed to cantilever on both the East and the West sides of the existing bridge. Once the outrigger steel supports were completed, it was time to construct the 80-tonne Steel Gantry System to connect the North South piers. |
|
|
Completed & In Progress Projects
We are happy to share some of our completed and in progress projects over Norfab's history. Past projects are added weekly, stay tuned!
A notable Edmonton project that Norfab was thrilled to have had the opportunity to be a part of.
The Train 4 Arrow Utilities Wastewater Treatment Plant upgrade is a major upgrade to add a fourth secondary treatment train.
Find us in North West Edmonton |